Below is an actual price breakdown of one of our recently finished projects, to give you an idea of costing and how a job is itemised for pricing. The breakdown is a little simplified to give more rounded information, as to list each item for such a large project would result in information overload.
The bathroom in question would qualify as one of the larger projects we do. Including all tiling (floor and walls) Full Bathroom suite (inc. luxury whirlpool bath) also Full Shower Base Cubicle with Concealed Shower Valve and Head.
Time taken from start (stripping out old suite) to finish....approx 9 working days.

Remove tiles and old suite and reapir walls ready for tiling. £300.00
Tiling of walls and floor (total 21 meters). £550.00
Fitting of shower base and cubicle. £250.00
Fitting of whirlpool bath, basin and toilet. £350.00
Fitting of new concealed shower valve and head. £100.00
Altering of pipework and fitting of new heated towel rail. £100.00
Supply and fitting of fan also fitting of whirlpool spur. £250.00
TOTAL LABOUR £1900.00
Supply Whirlpool Bath, Basin and Toilet. £800.00
Supply Shower Cubicle and Base. £390.00
Supply Concealed Shower Valve and Head. £295.00
Supply Towel Rail and Valves. £140.00
Supply 3 Bar Shower Pump. £340.00
Supply plumbing materials inc. plywood, cement board, tile adhesive, grout etc. £200.00
Supply 17 meters of Wall Tiles. £380.00
Supply 4 meters of Floor Tiles. £140.00
TOTAL MATERIALS £2685.00